Starting Fortia…

Taking longer than usual. Inspections you started are saved on this device.

Skip to content

Fortia won’t take “done” for an answer.

Inspection software for operators with many sites, or one big one. A job marked done is not a problem fixed, and head office sees what no single site can.

Request early accessFree during early access

10:31Thu 8 Oct, Havnegade

Building services marked the walk-in fridge’s door-seal job done a minute ago. The finding waits for Jonas to recheck it.

Work order: resolved.Finding: not closed.

FindingPending verificationCritical

Walk-in fridge above 5 °C

Havnegade

Resolved by Building services on October 8. The recheck is with Jonas Berg, due October 8.

Drawn live by Fortia’s own components. Demo data: Nordbrød is a fictional estate of 312 sites.

Proven fixedThe week before, the same fridge was marked done once already.

Marked done twice. Closed once.

A week earlier, a compressor service on the same fridge was marked done too. Its recheck the next morning failed, so the finding stayed open.

07:11 Fri 2 Oct, 6 days earlier

FindingVerification failedCritical

Walk-in fridge above 5 °C

Havnegade

Waiting on a manager to send the fix back or reject the work order.

Recheck failed Oct 2, 2026 — Jonas Berg
Still 7 °C the morning after the service.

07:06 Thu 8 Oct

Findings list, Havnegade4 sightingslast seen 1 minute ago by Sara Holm

Every failure since joined that one finding as a sighting, not a new ticket. Seen again and again and still unrepaired, it went to the top of the manager’s morning list.

The record and its row on the findings list, drawn live. Demo data.

Patterns across the estateHavnegade was not the only site with this fridge failing.

14 sites, one problem, named.

Every night, similar findings from two or more sites are grouped into one pattern by what they say, and named. Head office reads the walk-in fridge once, not site by site, and changes the standard where it is weak.

Pattern3 still openCritical

Walk-in fridge above 5 °C at opening

Sydhavn

  • Sluseholmen open
  • Køge

Udland

  • Malmö Triangeln open

Nordkysten

  • Gilleleje open
  • Hellerup
  • Lyngby
  • Hornbæk

Havnen

  • Havnegade closed 11:03

Vestegnen

  • Valby
  • Roskilde
  • Glostrup
  • Ishøj

Centrum

  • Amagerbro
  • Frederiksberg

The pattern as Anna opens it at 15:40 on 8 October, across 312 sites; its head drawn live, its name written for this page. Demo data.

Checks on the checksThen the question behind it: can the checks themselves be trusted?

Checks on the checks.

Head office writes a check once. Fortia then checks the checks: the question, the site and the inspector. Each signal points; a person decides.

“Is the exit route clear?”

24 outlets, one question, two readings.

Some outlets never fail it; others fail it often. In the program editor every question is checked for never failing, often not applying, or failing unevenly at sites of one type: a hint that the wording reads differently from place to place.

Answers
3,412
Fail rate
9%
304 of 3,380
Not applicable
0.9%
32 answers

Answered inconsistently

Outlet: 9 sites never fail it; 8 fail it 27% of the time or more.

24 sites with 10+ answers each, by how often they fail it
  • Never9
  • Under 10%4
  • 10% to under 27%3
  • 27% or more8

Edit a copy to reword it so a fail looks the same everywhere.

3,412 answers from 296 sites since v4, when its wording last changed. Answers to older wording are left out; option edits since then are not.

A site drifting from its own usual

−13 points under its own usual, and falling.

Scores, rushed runs, overdue checks and repeats, each read against the site’s own history and back-tested on yours, so a signal that predicts nothing never moves a site. It needs months of runs to say much.

Better than usualWorse
ConditionalDaily opening checkOct 7, 2026usually 9279

Against the inspector’s own history

Answered “Yes” 18 runs in a row.

“Are floors and walkways clear and dry?”, flagged by the review before he signs.

3 minutes, for a run he usually takes 16.

Listed once a run is at least three times faster than his own usual; never set against a colleague.

Question health on the closing check; Teglholmen’s last twelve opening checks (point at a bar to read it); Emil Nygaard at Toldboden on 7 October. Health and drift drawn live; the inspector’s figures drawn from his runs. Demo data.

AI draftsA flagged question gets a suggested rewrite, and an author decides.

AI drafts. A person decides.

Where Fortia uses a model, it writes a draft and stops. Nothing is filed, assigned or published until someone accepts it, edits it or turns it down. Try them.

A work order, drafted for a manager

Drafted from the finding and similar earlier ones, with a title, a route and a due date. The manager edits the title, creates it, or rejects it.

Suggested work order

Pending review
Adjust the closer and plane the threshold edge on the fire door to the yardMajor
Fire door to the yard drags on the threshold
Route: ManagerDue Sep 28, 2026

Nothing is filed until a manager accepts it, edits it or rejects it.

A rewrite, or a plain no

New wording for the question the outlets read differently. When the numbers no longer flag it, it says so instead.

Current wording (v4)

Is the exit route clear?

Suggested by AI

Can you walk the whole exit route, from the door to the street, without moving stock, cages or cleaning gear?

Sites of one type disagree on what counts as clear; the new wording says what to look for along the whole route.

Starts draft v5 from this version and changes the wording there. The published version stays as it is.

Translation briefed with your glossary

Machine translation briefed with your glossary; a reviewer approves it before inspectors see it.

Question textAI — Drafted by AI — review before approval.
English

Fire door to the yard: seconds to close and latch from fully open

  • “fire door” is translated as “Brandschutztür”
Deutsch

Waiting for review: inspectors see it only after a reviewer approves the translation.

Shown with demo content. AI work orders and translations are modules you switch on.

The inspector arrives briefedWhat head office decides reaches the inspector at the check.

6.4 seconds, and slower every week.

The fire door at Strandvejen still closes inside its limit, but slower each run, and the inspector sees it on the check, with everything else known about this door.

This run
1Entrance and exits5/6
  • 1.1
  • 1.2
  • 1.3
  • 1.4
  • 1.5
  • 1.6
2Fire doors3/5
  • 2.1
  • 2.2
  • 2.3
  • 2.4
  • 2.5
3Stockroom0/6
  • 3.1
  • 3.2
  • 3.3
  • 3.4
  • 3.5
  • 3.6
Before you can sign2
  • 1.4Owes 1 photoExit light over the yard door lit?
  • 1.6Skipped requiredEmergency lighting tested this month?
Found on this run1
  • 1.2MajorExit route from the stockroom partly blocked

2 before you can sign

2.3Required

Fire door to the yard: seconds to close and latch from fully open

Major findingopenFire door to the yard drags on the thresholdopened 14 days agoseen on 2 earlier runswork order In progress
Written about this site
  • PinnedSwells after the floor is washed and drags for an hour. Time it before cleaning, not after; the drag itself is the open finding, not a new one.
  • Closer arm hisses near the end. Building services have it on the work order.

+0.6 s vs yesterdaylast 5 runs 4.2 → 5.8climbing

The faint ticks on the band are the last five runs: 4.2 seconds five weeks ago, 5.8 yesterday.

How to check

A fire door has to close and latch on its own. A slow door is the first hint of a closer wearing out or a frame dropping.

  1. Step 1

    Open the door fully and let go. Do not push it or hold the handle.

  2. Step 2

    Time it from the moment you let go until the latch clicks.

  3. Step 3

    Check the latch engages without a push. If it does not, say so in a note.

In the manual

  • Fire doors: care and testing manualPage 14Closer adjustment and closing time
For this check
On this check
Major findingopenFire door to the yard drags on the thresholdopened 14 days agoseen on 2 earlier runswork order In progressLatest note“Closer arm hisses near the end. Building services have it on the work order.”Kasper HoltOct 7
How to check

A fire door has to close and latch on its own. A slow door is the first hint of a closer wearing out or a frame dropping.

  1. Step 1

    Open the door fully and let go. Do not push it or hold the handle.

  2. Step 2

    Time it from the moment you let go until the latch clicks.

  3. Step 3

    Check the latch engages without a push. If it does not, say so in a note.

In the manual

  • Fire doors: care and testing manualPage 14Closer adjustment and closing time
Written about the yard door
  • PinnedSwells after the floor is washed and drags for an hour. Time it before cleaning, not after; the drag itself is the open finding, not a new one.
Strandvejen, 06:58 on 8 October. The middle column is the runner as it ships and what a phone shows; the desk adds the run on the left and this check on the right. Demo data: Nordbrød is a fictional estate of 312 sites.

With hands busy, the phone will read each question aloud and take the answer to a choice question by voice, in English or Danish.

The runner’s voice strip, drawn from its own styles. Voice answers and the desk layout are work in progress.

Sign-offBefore Kasper Holt signs, the review asks about 1.2, the blocked exit route.

No signature without a review.

Before anyone signs, the review lists what a person must decide, and the signature covers exactly the answers it reviewed.

Change an answer after the review, and the signature is refused until it has run again.

A critical answer halted the run.
No clean signature. Change the answer, or close with the halt on file.
A crew member’s work hasn’t synced.
Not signed over it. Wait for their device, or take them off the crew.
Two people’s answers disagree.
Settle them, or close with a documented exception.
You did the fix, and now you verify it.
That takes the permission and a written reason.

The answers changed after the review was run. We’ve run it again — check it, then sign.

Automated check

Needs review2 flags to decide

Needs a decision

2
  • Partly blocked selectedWarning

    Major finding

    Is the exit route from the stockroom to the street clear?

    Your decision
  • Follow-up will be proposedWarning

    A work order will be proposed for the blocked route once this is signed.

    Your decision

Decide on 2 flags to sign.

Kasper Holt changed an answer after deciding both items. The sign-off sheet, live: decide the items yourself. Demo data.
Back at HavnegadeJonas rechecks the fridge.

11:03Thu 8 Oct

Now it is done.

Jonas’s recheck read 4 °C. Done never closed this finding; a passing recheck did, and the failed one stays on the record.

FindingVerified closedCritical

Walk-in fridge above 5 °C

Havnegade

Verified closed on October 8, 16 days after it was found.

The finding a minute after the recheck, drawn live. Demo data.

At 06:00 the next morning, v4 of the opening check added a door-seal question for every walk-in fridge, at every site.

309 of 312 sites

had run v4 by 20:00 that day; the rest take it at their next inspection.

And what you would expect of an inspection tool

  • Work orders from failed answers
  • Checklists drafted from a PDF or a photo
  • Findings from a photo or voice note
  • Required photos
  • Works offline
  • Schedules and QR stickers
  • Deadlines and escalation
  • Downtime figures
  • CSV exports and an audit log
  • Facility groups for hundreds of sites

Bring the problem that keeps coming back.

Fortia is in early access and free while it is. Tell us who you are and how many sites you run; we reply within two working days and set up your first programs with you.

Sites

Sent to the Fortia team's inbox. We use it only to reply. Prefer to write? hello@fortia.cloud.